Saturday, January 31, 2015

Another one in the books

This past week I finished up my very first renovation in Century Village. Century Village is a 55+ community that contains thousands upon thousands of apartment units where elderly people call home. Most of the buildings were built back in the 1970s, and are really beginning to show their age. And that is where I come in. In this particular apartment unit, the following things were updated:

  • Remove existing kitchen cabinets and countertops and install new kitchen
  • Install new kitchen appliances
  • frame down existing popcorn ceiling, and drywall, tape, and finish for a nice, clean painted ceiling with all wire molding concealed in the framing.
  • Install new master bathroom vanity, remove existing bathtub and transform into shower with frameless doors
  • New floating powder bath vanity, new top, new vessel sink, new toilet fixture 
Below are the pictures. The job took about 5 weeks to complete, and that was including the time off on Christmas and new years.